Skip to contentSofie Regulatory Intelligence: nine regulators, one place, updated every day.

Solutions · Engineering & Consulting

Deliver more client workwith the same bench.

Sofie drafts the validation, facility and quality deliverables your consultants produce, in each client's format, so senior people spend their hours on judgment rather than assembly.

Larkspur Biologics · CoDraft
LB-204 Tech Transfer Charter.docx
ARMK
Share
Review
Track changesAccept

Tech Transfer Charter · Controlled

LB-204 Drug Substance Transfer

Version 0.4 · Draft for QA review

3. Scope of Transfer

This charter governs the transfer of the LB-204 upstream and downstream process from Larkspur Biologics, Cambridge (sending site) to {Receiving site} (receiving site). The transfer covers the 2,000 L fed-batch process through drug substance release, including fill-finish operations.

4. Roles and Responsibilities

5. Process Overview

CoDraft: deliverables drafted in your client's own Word format, exported exactly as they appear.

Inconsulting,thehoursarethebusiness.Sofietakesthehoursspentassemblingdeliverablesandreturnsthemtotheworkclientsactuallypayfor.

Work Sofie takes on

Work Sofie takes on for engineering and consulting firms

Deliverable-heavy workflows from CQV, quality and operations.

Browse all 116 workflows
  1. 01

    User Requirements Specification (URS)

    CQV · Workflow

    Turn your system needs and design inputs into a traceable, qualification-ready URS — in an afternoon, not weeks.

    Manual effort today

    20–40 hours across engineering, QA, and validation

  2. 02

    Validation Master Plan (VMP)

    CQV · Workflow

    Turn scattered equipment lists, half-finished qualification records and undocumented intent into a governing Validation Master Plan — scoped, risk-prioritised, and honest about what is not yet covered.

    Configured to your procedures

  3. 03

    Computer System Validation (CSV / CSA)

    CQV · Workflow

    Turn scattered requirements, risk assessments, vendor documentation and test evidence into a GAMP 5-aligned validation deliverable — drafted, traced end to end, and gap-checked in an afternoon rather than a month.

    Manual effort today

    Three to six weeks per system

  4. 04

    GMP Facility Proposal / Design Basis

    Business Operations · Workflow

    Turn your process and site inputs into a design-basis-grade facility document — in an afternoon, not weeks.

    Manual effort today

    30+ hours across engineering, QA, and EHS

  5. 05

    Quality Risk Assessment (QRM / FMEA, ICH Q9)

    Quality Records · Workflow

    Turn a process, change, or deviation into a structured ICH Q9 risk assessment — hazards scored, ranked, and ready to act on — in an afternoon, not weeks.

    Manual effort today

    15–30 hours across SMEs

  6. 06

    Knowledge Gap Assessment

    Tech Transfer · Workflow

    Authors, or independently reviews, a GMP-compliant Knowledge Gap Assessment for a defined product/process/site-pair technology transfer scope.

    Estimated time saved

    ~15–25 hrs per knowledge gap assessment

  7. 07

    Statement of Work (SOW)

    Business Development · Workflow

    Turn your engagement notes and service offering into a tightly scoped SOW — in an afternoon, not weeks.

    Manual effort today

    10–20 hours drafting and negotiating scope across BD and delivery

  8. 08

    Lessons-Learned / After-Action Report

    Business Operations · Workflow

    Turn a closeout or a post-event review into a record where every lesson names what should change, where that change lives, who owns it, and how you would know it had been adopted.

    Configured to your procedures

A day in the life

The same work, without the assembly.

Your experts still make every call. Sofie gathers the evidence, drafts in your format and marks what is missing.

A new engagement

Scope written tightly the first time

Before
The SOW goes back and forth because the boundary and assumptions were never pinned down.
With Sofie
Sofie drafts the SOW from the proposal and discovery notes and lists the assumptions to confirm with the client.

Deliverable week

Client formats, handled

Before
Consultants rebuild each deliverable in the client's template and fix formatting by hand.
With Sofie
Import the client's .docx as a template; Sofie fills it from the engagement workspace and the export matches Word exactly.

Close-out

Lessons that carry to the next client

Before
What the team learned stays with the people who were on the project.
With Sofie
Sofie drafts the after-action report from the engagement record, and Memory carries the lessons forward under your governance.

Start with one workflow.
Measure it. Then expand.

In a working session we choose a priority workflow, define your standards and review points, and agree how to measure speed, quality and capacity. Then you evaluate Sofie's work before deciding whether to expand.